In short
- You pay in steps during the build. Every payment before delivery must be covered by a bank guarantee or an insurance.
- You pay 10% VAT with each payment, and stamp duty at the deed.
- Inspect the home before you sign the deed and have the defects written down.
- By law the home is guaranteed for one year on finishes, three years on fitness to live in and ten years on the structure.
A large part of the homes on this website are new: finished and never lived in, under construction, or still a plan. Buying from a builder has clear advantages. The home is new, you can often choose finishes, and you pay in steps. It also asks for trust, because you pay for something that does not exist yet. Spanish law has rules for exactly that.
Finished, under construction or off plan
- Ready to move in. The home is built and has its papers. The purchase runs like any other: reservation, contract, deed. You see what you buy.
- Under construction. The building licence has been granted and work has started. You buy from the plans and from a show home, and you pay in steps.
- Off plan. Sales have started before the build. Ask whether the building licence has been granted. Until it has, there is no fixed delivery date.
Every new-build home on this website shows its delivery date as the builder planned it. A date is a plan, not a promise, until it stands in your contract.
What you sign and when you pay
- Reservation. A few thousand euros take the home off the market while your lawyer checks the project.
- Purchase contract. It contains the price, the plans, the list of materials and equipment, the payment schedule, the delivery date and what happens when that date is missed.
- Payments during the build. Every project has its own schedule. A common pattern is 20 to 40 percent before delivery, in two or three steps.
- The deed at the notary. When the home is finished and has its papers, you pay the rest and receive the keys.
With each payment you pay 10% VAT on that amount. At the deed, stamp duty comes on top: 1.4% in the Valencia region, 1.5% in the Region of Murcia, 1.2% in Andalusia. The purchase cost calculator shows the total.
The guarantee for what you pay in advance
This is the most important protection, and the law is clear about it. A builder who receives money before the home is delivered must:
- guarantee the return of every amount, plus legal interest, with a guarantee from a bank or an insurance policy, in case the home is not started or not delivered on time, and
- keep the money in a special account that may only be used for the build.
The duty applies from the moment the building licence has been granted. For each payment you should receive a guarantee document in your name for that amount. Ask for it every time, and let your lawyer see it. Do not accept a general promise that guarantees will follow later.
If the delivery date passes and the home is not ready, you can choose: cancel the contract and claim your money back under the guarantee, or give the builder more time.
What your lawyer checks before you sign
- That the builder owns the land, and whether a loan for the build is registered on it.
- That the building licence has been granted.
- That the guarantee for advance payments exists, and with which bank or insurer.
- The plans and the list of materials, which should be attached to the contract.
- The delivery date, and the compensation if it is missed.
- What is and is not included: kitchen appliances, lighting, air conditioning, garden, pool, parking and storage.
Changes during the build
Early in the build you can often choose tiles, kitchen fronts and colours, and sometimes move a wall or add a pool. The later you ask, the less is possible. Have every change confirmed in writing, with its price.
The delivery
Before the deed, visit the home, or send someone who does this for a living. Open every window, run every tap, try every socket and look at the tiles in daylight. Everything that is not right goes on a list that the builder signs, with a date by which it is repaired.
At the deed the home should have:
- the certificate that the work is finished,
- the document that allows it to be lived in (the first occupation licence, or the declaration that replaces it in some regions),
- the ten-year insurance for the structure,
- its own entry in the land registry, and
- water and electricity ready to be put in your name.
The guarantees after delivery
The building law gives every buyer of a new home three guarantees.
| For | How long | What it covers |
|---|---|---|
| Finishes | 1 year | Defects in the finishing: paintwork, tiles, joinery |
| Fitness to live in | 3 years | Defects in the building or the installations that make the home unfit to live in properly, such as damp or failing insulation |
| Structure | 10 years | Defects in the foundation, the load-bearing walls, beams and floors that put the stability of the building at risk |
For the ten years the builder must have an insurance, and the notary asks for it. A claim has to be made within two years after the damage shows, so report defects in writing as soon as you see them.
Who the builder is
This website shows homes by their project, not by the builder's name. Your advisor tells you who builds a project, what they have built before and where you can go and see it.
What we do
We know the projects, we visit the sites, and we tell you plainly when a plan is still only a plan. During the build your advisor passes on the progress and goes to the inspection with you, or for you.
Sources
The rules and numbers in this text come from these pages.
- Ley 38/1999 on building (guarantees, and the first additional provision on advance payments), consolidated textBoletín Oficial del Estado (official state gazette)
- Ley 20/2015, third final provision (change to the rules on advance payments)Boletín Oficial del Estado (official state gazette)
- Ley 13/1997, article 14 (stamp duty in the Valencia region), consolidated textBoletín Oficial del Estado (official state gazette)